PPWR Article 15 manufacturer obligations explained

Stella Winther Stella Winther
8 min read

PPWR Article 15 sets out what the manufacturer of a pack must do before and after selling it in the EU, from 12 August 2026. This guide explains in plain words who counts as the manufacturer, the checks and paperwork needed before sale, how long to keep the file, what to do when a pack fails and which tasks you can hand to others.

A wooden clipboard reading PPWR Article 15 leaning against a closed cardboard box, with a fountain pen lying on top

PPWR Article 15 lists the duties of the company that counts as the manufacturer of a pack. Before the pack is sold in the EU, the manufacturer must check it meets Articles 5 to 12, write a technical file on it and sign an EU declaration of conformity.

These duties apply from 12 August 2026. The manufacturer is often the brand on the pack rather than the factory that made it, so the first job is working out who that is. Below is each duty, who carries it and what happens when a pack falls short.

What does PPWR Article 15 require?

Article 15 of Regulation (EU) 2025/40, the Packaging and Packaging Waste Regulation (PPWR), sets out what the manufacturer of a pack must do. Here are the key facts in four lines.

  • Applies from. 12 August 2026, the day PPWR applies across the EU.
  • Who it hits. The one company that counts as the pack's manufacturer, usually the brand owner.
  • What it covers. Proof that the pack meets the packaging rules in Articles 5 to 12, and the paperwork behind that proof.
  • What is still open. Some of the rules the proof is checked against, such as the recyclability grades, are not adopted as of October 2026.

Article 15 has 12 paragraphs. The table puts each duty into plain words, with the paragraph it comes from.

Duty In plain words Paragraph
Sell only compliant packs Every pack you place on the EU market meets Articles 5 to 12 15(1)
Assess and document Run the conformity check and write the technical file before the pack goes on sale 15(2)
Sign the declaration Draw up the EU declaration of conformity once the check is passed 15(2)
Keep the file Store the file and the declaration for 5 years, or 10 for reusable packs 15(3)
Stay compliant in production Re-check when the design, the materials or the standards change 15(4)
Make the pack traceable Put a type, batch or serial number on the pack 15(5)
Say who you are Show your name and postal address on the pack or behind a QR code 15(6) and 15(7)
Fix what goes wrong Correct, withdraw or recall a pack that fails, and tell the authority 15(8) and 15(9)
Answer the authority Hand over the documents within 10 days of a request 15(10)

Two paragraphs are exceptions rather than duties. Article 15(11) lifts the assessment, paperwork and record-keeping duties for custom-made transport packaging for configurable medical devices used in industry and healthcare.

Article 15(12) moves the duties away from some micro-enterprises, covered in the next section.

Article 15 is one of the PPWR rules mapped in the guide to the PPWR requirements.

Who is the manufacturer under PPWR?

The manufacturer under PPWR is not always the company that physically makes the packaging. Article 3(1)(13) gives the role to whoever has the pack designed or made under its own name or trademark, even when another brand also shows on it.

The PPWR guidance document from the European Commission of 5 June 2026 adds that a pack has only one manufacturer across the whole EU. The guidance gives four rules of thumb for finding that company.

  1. Sales and grouped packaging. Normally the company that fills the pack with its product, which is often the brand owner.
  2. Transport and service packaging. Normally the company that makes it, unless the user's name or trademark is on it.
  3. Packaging with no brand on it. Whoever places the order and decides the design of the pack.
  4. Importers and distributors. Under Article 21 they become the manufacturer when they sell a pack under their own name, or change it in a way that could affect compliance.

When a micro-enterprise hands the role to its supplier

Article 15(12) protects the smallest brands. A micro-enterprise has fewer than 10 staff and a turnover or balance sheet total of no more than EUR 2 million. When such a company sells packs under its own brand, its packaging supplier becomes the manufacturer instead.

Drawing of a small jam shop and a jar factory side by side, with an arrow carrying the manufacturer duties from the shop to the factory that supplies its jars

The law words the supplier's location in two ways. Article 15(12) says the supplier must be in the EU. The definition in Article 3(1)(13)(b) says it must be in the same EU country, and the Commission's guidance follows that stricter reading.

When the brand and the supplier sit in the same country, both texts agree. When the supplier is in another EU country, check with your national authority before you rely on the shift.

What must a manufacturer do before a pack goes on sale?

Most of Article 15 happens before the first pack reaches a shop or a customer. Below are the steps in the order the law sets them.

  1. Check the pack against Articles 5 to 12. They cover substances of concern, recyclability, recycled content, compostable packaging, packaging minimisation, reusable packaging and labelling.
  2. Run the conformity assessment. Article 38 points to Module A in Annex VII, a conformity assessment the manufacturer carries out itself or has done on its behalf, for example by a lab.
  3. Write the technical documentation. The technical documentation is the evidence file behind the declaration, described below.
  4. Sign the EU declaration of conformity. One declaration for each packaging type, drawn up under Article 39 once the check is passed.
  5. Mark the pack. Add a type, batch or serial number, plus your name or trademark and postal address on the pack or behind a QR code.

Contents of the PPWR technical file

Annex VII lists what the file must contain, where each part applies. Under Article 16, the suppliers of your packaging and materials must give you the information you need for it.

  • The pack. A general description and its intended use.
  • The design. Drawings, the materials of each component and the explanations needed to read them.
  • The standards. Which harmonised standards, common specifications or other technical specifications you applied, in full or in part.
  • The assessments. How you assessed recyclability, minimisation and reuse under Articles 6, 10 and 11.
  • The tests. The test reports.

The guide to requesting packaging data from suppliers shows how to ask for the supplier half of the file.

How long must a manufacturer keep the PPWR paperwork?

Article 15(3) counts from the date the packaging was placed on the market. Single-use packaging needs the technical file and the declaration kept for 5 years, reusable packaging for 10.

Drawing of a timeline starting on the day a pack is placed on the market, with a short bar running 5 years for single-use packaging and a long bar running 10 years for reusable packaging

Keeping the papers is not the end of it. Article 15 adds three duties that run for as long as the pack is sold.

  1. Keep production in line. Have procedures so every batch matches the assessed pack, and re-assess when the design, the materials or the standards you rely on change.
  2. Keep the declaration current. Article 39 says the declaration must be continuously updated.
  3. Answer the authority fast. On a reasoned request, a market surveillance authority gets the documents within 10 days, electronically and on paper if asked, in a language it understands.

What happens when a pack fails the PPWR rules?

Article 15(8) covers a pack already on the market that the manufacturer finds, or has reason to believe, does not comply. The manufacturer must then act at once on two fronts.

  • Fix the pack. Bring it into line, withdraw it or recall it, whichever fits the problem.
  • Tell the authority. Inform the market surveillance authority in the country where the pack was sold about the problem and the steps taken.

One exception applies. Under Article 15(9), reusable packaging placed on the market before 11 February 2025 does not have to be fixed, withdrawn or recalled.

Authorities can also act on paperwork alone. Under Article 62, an EU country must order the company to end the problem in these cases.

  • The declaration. It is missing or drawn up wrongly.
  • The technical file. It is missing, incomplete or has errors.
  • The name and address. They are missing, false or incomplete.
  • Anything else. Any other paperwork duty in Article 15 is not met.

Which Article 15 duties can someone else take on?

The Commission's guidance is clear that the manufacturer stays the only company legally responsible for the pack, whoever wrote the declaration. Some of the work can still be handed to others.

Who What they can do What stays with the manufacturer
A lab or certification body Carry out the conformity assessment on your behalf Responsibility for the result
An authorised representative Keep the file and the declaration, deal with authorities, answer requests within 10 days Placing compliant packs and writing the technical file
Your suppliers Hand over the data and documents you need for the file Responsibility for the declaration built on that data

An authorised representative must be based in the EU and needs a written mandate under Article 17.

That is a different role from the authorised representative for extended producer responsibility (EPR), who handles a producer's registration and reporting in a country where it has no base. The guide to appointing an EPR authorised representative covers that second role.

How does Article 15 connect to the declaration of conformity?

The declaration is where the Article 15 work ends up. Under Article 39 it states that the pack meets Articles 5 to 12, and by drawing it up the manufacturer takes responsibility for that.

The declaration follows the model in Annex VIII, with 8 numbered fields and a signature block, in the language each EU country requires.

The guide to the EU declaration of conformity explains the document itself.

PPWR rules still waiting for EU acts

Some of what the declaration confirms is not settled yet. As of October 2026 the EU has not adopted the acts that set the recyclability grades under PPWR Article 6, or the act that sets the label design under Article 12.

Until the recyclability acts apply, the Commission's guidance says manufacturers do not need to run the Annex VII assessment for recyclability. When the acts land, plan to re-check the packs they affect and update their declarations.

Where Repax Declare fits

Repax Declare builds the declaration for each packaging type, with all 8 Annex VIII fields and the signature block, a QR code to the live declaration and a new version each time the pack changes.

Try Repax Declare for free - no card required Fill in the form, sign it, and get your first declaration. Try it free

Declare does not test packs or decide whether they comply. That stays the manufacturer's job under Article 15. Declare makes the declaration correct, traceable and ready when an authority asks for it.

The full text of Article 15 is in Regulation (EU) 2025/40 on EUR-Lex, and new EU acts on packaging appear on the European Commission's packaging waste page.

Frequently asked questions about PPWR Article 15

Below are five questions packaging companies often ask about the manufacturer duties.

When does PPWR Article 15 start to apply?

From 12 August 2026, when PPWR applies across the EU. The duty to fix, withdraw or recall a failing pack reaches further back, to packaging placed on the market from 11 February 2025, when the regulation entered into force.

Is the manufacturer always the company that makes the packaging?

No. Under PPWR the manufacturer is usually the company whose name or trademark is on the pack, even when a supplier made it. For a pack with no brand, it is whoever orders the pack and decides its design.

Can a micro-enterprise skip the Article 15 duties?

Not quite. A brand with fewer than 10 staff and no more than EUR 2 million in turnover or balance sheet total passes the duties to its packaging supplier. The texts differ on whether that supplier must be in the same EU country.

How fast must a manufacturer answer a request from an authority?

Within 10 days. On a reasoned request, Article 15(10) requires all the information and documents showing the pack complies, technical file included, electronically and on paper if asked, in a language the authority understands.

Does EPR registration cover the Article 15 duties?

No. EPR makes the producer pay for collecting the waste in each country where the pack is thrown away. Article 15 makes the manufacturer prove the pack itself complies, and the two roles can sit with different companies.

Written by

EPR content curator

I write about Extended Producer Responsibility, which is exactly as glamorous as it sounds. Someone has to translate it for human beings. That someone is me.